ELY-111 GOMEZ

Singapore

currently: Job hunting


Work history

Prosafe Production Pte Ltd June 2008 to January 2009
Site Engineer/E&I Tech

tags:

How would you describe your time at Prosafe Production Pte Ltd?

1. To carry out checking and tracing of existing instrument cable at engine room , pump room to Central control console at ???A deck as per P& ID
2. To check all the new instruments at top side Modules and its puch list.
3. To assist and coordinate the Keppel to carry out instrumentation
issues
4. Monitored the Alpine contractor in Instrument Cable pulling, Termination of wires as per Cable schelude and P& ID.
5. To monitor installation of Tank Gauging System its Panel such as SCU, I/O Interfaces, and I/O Box, Installation of Saab Radar type Level transmitter, Level switches, and Temperature Transmitter at Cargo Oil Tank top side.
6. To carry out monitoring of Installation of (WBT) water ballast Tank Dampos Mas 2600 Level transmitters and its transducers.
7. To monitor Installation and modification of New Inert Gas System, ODME system and Data Logger and ODME system at ???A??? Deck.
8. To carry out MC ITR of all instrumentation.