Answers from Ibrahim

How would you describe your dream job in 10 words or less?

Innovative,challenging environment with chances for self development enchancing the growth of the company.

Posted @ 12:28AM, December 29, 2007 by Ibrahim Shariff | Permalink
Answer this question | See all answers for this question

Work history

CH2M HILL International September 2007 to the present
C & I Engineer

How would you describe your time at CH2M HILL International?

To take care of C&I related site engineering activities and also to Commission the 5.0 MIGD SWRO Desalination Plant.
MEGATECH CONTROL FZCO June 2006 to August 2007
Site In charge/Team Leader,Snr. Project Engineer

tags:

How would you describe your time at MEGATECH CONTROL FZCO?

Assigned as Snr.Project Engineer in Khursaniya-KPF for Megatech. Leading team of Engineers in selection of Instruments, Preparation of Data sheets, preparing cable schedules, developing of I/O database, Prepare for FAT and Conduct FAT for GEFanuc PLC and IFIX SCADA systems. Installation, Testing and commissioning of Instruments & control (GEFANUC PLC & IFIX SCADA system)... read more
RHM & Sons November 2003 to May 2006
Instrumentation & control Engineer

tags:

How would you describe your time at RHM & Sons?

DCS, PLC, ESD, VMS- System Testing (SAT). Pre Commissioning and Commissioning of Hart, Foxcom & FFB related Instruments. Loop checking, Troubleshooting, Calibration, Logic checking, Checking of Complex Control Loops, Preventive and Corrective Maintenance, Plant Interlocks, Test Documentation and Generation of Instrument Database & I/o Database... read more
POWERICA LTD May 2001 to November 2003
OPERATION AND MAINTENANCE

tags:

How would you describe your time at POWERICA LTD?

Installation of MCC, Control panels for the distribution of Power, synchronization of Alternator, breaker panels, transformers (11kv/480v), Instruments ???Pressure, Temperature, Flow and Level. Control systems- PLC (AB) and SCADA Systems. Commissioning of all Electrical, Instrumentation and Control systems.Maintenance of all mechanical, electrical and electronic equipments. PLC (ABB) and SCADA system for the Process variables indication and control of the alternators, MAN engines, Lube oil Separators, MCC, storage tanks level and temperature, Control panels for the distribution of Power, synchronization of Alternators. Maintenance of records for the power generated, HFO consumption, Lube oil consumption, co-ordination with the customer. I was leading a operation and maintenance team of 10 mechanical technician, 10 electrical technicians and 5 instrument technicians.... read more

Similar People

Sathya Rangaramu
System Controls E...
Cummins
WCDMA System Test...
Alcatel-Lucent
Independent Consu...
AllNet Solutions
S Verma
Senior Process Co...
AppLabs Technologies
NEDELCU GABRIEL
MECHANICAL SUPERV...
DANIELI WEAN UNITED
Project Engineer
Eli Lilly