for protection of personnel from prompt radiation, in the framework of accelerator safety systems (Personnel Protection Systems and Beam Containment Systems..
performance of responsibilities. The position will be an active member of Stanford's computing community and will also sit as a key member of the SLAC Computing..
In 2009 The Linac Coherent Light Source (LCLS), which is the world's first hard x-ray free electron laser, began operation at SLAC. In CERN the Large Hadron..
Group at the Stanford Synchrotron Radiation Lightsource (SSRL), a Directorate of the SLAC National Accelerator Laboratory, Stanford University, and a national..
Staff Scientist arrived 9 days ago from Stanford Linear Accelerator Center
The Alignment Engineering Group of the Metrology Department is looking for a geomatics engineer. Duties include the implementation of data collection software..
Geomatics Engineer arrived 9 days ago from Stanford Linear Accelerator Center
be the central point of contact and coordinate all deliveries to the computer center, process shippers (which include obtaining RMA information for the return..
to enable large scale simulations to meet planned SciDAC goals for new accelerator design. This position has the possibility to converting to regular on going..
The SLAC Research Engineering Group develops state-of-the-art instrumentation for radiation detectors to support particle physics and photon science experiments..
ASIC Design Engineer arrived 10 days ago from Stanford Linear Accelerator Center
The primary duty (>90%) is the development (including design, construction, installation, and initial operation) of pulsed power modulators and related power..
Electronic Engineer arrived 11 days ago from Stanford Linear Accelerator Center
Matlab and/or ROOT Data Analysis Framework applications developed by collaborators are used for simulations and/or laboratory measurements of the Ge detectors..