Ivan Benedetic
Serbia and Montenegro
currently: Here to network
|
Work history
Project manager
tags:
project management
• estimating
• planing
How would you describe your time at New Era Development?
It was housing project in Accra, Ghana. Making of scopes of work. Making of construction plans. Making of financial plans. Making reports to the banks. Organizing and supervising of preparation works. Organizing and supervising of smaller civil and building services works. Project was stopped due to the problems with bank credit....
Site Manager
How would you describe your time at Diastasi Construction?
We built a pump station in Novi Sad, Serbia, for Hellenic Petroleum. It was short time contract, we had to complete pump station in two months. I made plans, requisitions for materials and equipment and supervised subcontractors. I controlled valuation of works done by subcontractor. Scope of work was from earth works, civil works, concrete works, steel erection works, building service works, road works to finishing works....
Site Manager
tags:
quantity surveying and estima...
• supervising and managing over...
• project management
How would you describe your time at Rokler, Moscow?
We built 65000 m2 shopping center at Kutuzov Prospect in Moscow. Firs I was responsible for finishing works, than I was responsible for building of 4500 m2 "Globus Gurme" supermarket inside the shopping center. First I made the scope of works and offer.We erected steel structure for offices,and store houses, inside the building, installed all necessary building services and equipment, gypsum walls, various kinds of ceilings and completed all finishing works. I supervised contracting both with client and subcontractors, all works from beginning to the end, valuated our works and supervised valuation of the works done by subcontractor, kept site documentation and contract documents and made correspondence with clients, inspectors, subcontractors and mine senior management. Wecompleted the Project....
Technical Manager
tags:
project management
• quantity surveying and estima...
How would you describe your time at YUBIKOR, Moscow?
We built residential area in Moscow District. 19 residential houses (20000m2 totally). It was engineering company, working with subcontractors. I supervised the works and made the scope of the works. I supervised contracting. Due to a budget problems (selling of the houses was slow), the project was stopped....
Project Engineer
tags:
project management
• quantity surveying
• land surveying
How would you describe your time at J&P Overseas Ltd. Libya?
It was water supplying project in Bisher, Libya, Bengazi Area. We built two big concrete water tanks and 4 km 1200 mm water pipe line. First 2 months I was replacing land surveyor who went final, till the new land surveyor came. I was setting out structural elements and pipe line with total station "SOKKIA" and level. After that I was replacing Project Engineer, who went on a two month vacation, I re designed pipe line according to the client's specifications. After that, I made new scope of the works because the old one was not correct and complete....
Site Manager
tags:
project management
How would you describe your time at Krajina Gradnja?
I supervised and managed 20 labors on construction of 1000 m2 residential building in Belgrade, Serbia. After 3 months I decided to go to Libya.
Project Manager- Civil Inspector
tags:
quantity surveying
• project management
How would you describe your time at Stankom , Belgrade?
Supervising and managing of subcontractors on the housing project in Belgrade. It was two 3000 m2 houses with flats. Supervising of valuation of the works done by subcontractor. Making plans and reports to the Senior Management. We completed the project. It was turn key Project.
Site Manager
tags:
project management
• quantity surveying and estima...
How would you describe your time at Monterra, Belgrade?
I was managing with 30 labors and subcontractors on the housing project in Belgrade. It was 4x 300m2 residential houses. It was Turn Key Project. We completed the project. After that we reconstructed offices and reception hall in Belgrade Truck Custom Department. We completed the contract. I left company, because the salary was 3 months late....
Site Manager
tags:
project management
• planing
• quantity surveying and estima...
How would you describe your time at Duga Sistem, Belgrade?
I was managing with 30 labors and subcontractors on the housing projects in Belgrade. It was 6000m2 residential houses for the Yugoslav Army high officers. It was Turn Key Project. After we built 5000 m2 of flats for Yugoslav Army younger officers. After we built 1200m2 of flats . We completed the contract. I left company, because the salary was 3 months late....
Site Manager and assosiate
tags:
quantity surveying and estima...
• project management
How would you describe your time at FACOM, Belgrade?
I was in a Joint Venture arrangement with a company owner. We reconstructed an old 1000 m2 Belgrade house into Mormonian Church. I made scopes of work and estimation. I signed contracts both with clients and the subcontractors. I supervised all the works and managed about 30 labors and subcontractors. I made valuation of the works and supervised and approved valuations of works done by subcontractors. I controlled payments and purchasing of materials and equipment....
Project Engineer
tags:
land surveying
• project management
• planing
• quantity surveying
How would you describe your time at J&P Overseas Ltd. Libya?
I was responsible for civil and land surveying works in: Dahra- Liquid Recovery Plant Ras Lanuf- Bus terminal in El Sider Ras Lanuf- Reconstruction of pipe line foundations in RASCO refinery. Ras Lanuf- Infrastructure works around the store house in RASCO refinery. Ras Lanuf- Reconstruction of the roof and facade of the bakery in RASCO refinery. Ras Lanuf- Reconstruction of Hotel in RASCO housing area. We completed that works. Ubari- Pipe Wrapping on the Water Injection Project. Gudwa- Murzuk high way. I completed 1 year in the Company....
Chief Inspector
tags:
quantity surveying and estima...
• quality controller
• project management
How would you describe your time at KOMGRAP, Belgrade?
Supervising of the housing project in Belgrade. I supervised 100 labors and subcontractors.
Education
C Driving License
tags:
c driving license
How would you describe your time at Driving School "Vidovdan", ...?
C- Truck Driving License Training
IT, DOS
tags:
certificate
How would you describe your time at Vincha Institute in Belgrade?
Dos Course
Advanced Infantry and Water Supplying Training
tags:
coprall course
How would you describe your time at Yugoslav Peoples Army?
Advanced Infantry and Water Supplying Training.
Water Supplying
tags:
basic military training
How would you describe your time at Yugoslav Peoples Army?
Basic Infantry and Water Supplying Training
Civil Engineering- Structural
tags:
bachelor civil engineer
How would you describe your time at University of Belgrade, Civ...?
It was the best part of my life. At that time, I played water polo in "Red Star" Belgrade, in first Yugoslav Division, trained two times a day, had no privileges,like extra examination terms or extra classes, except to study longer. So I studied 8.5 years instead 5.
Natural Science
tags:
high scholl graduate
How would you describe your time at V th. Belgrade High School?
It lasts four years. It was nice time.
English
tags:
advanced course of english
How would you describe your time at Institute for Foreign Langu...?
I went with adults, the last three years and graduated Advanced Course of English
Similar People
|
|
Owner/Operations ...
self employed
|
|
Program Manager
Microsolft/VTS
|
|
Freelance Consultant
Jason Ruyle
|
Buyer I
san diego state u...
|
|
|
|
|