Work history
Senior Engineer / Technical Staff
tags:
communications
• fire safety
• mechanical & electrical design
• nuclear auxiliary systems
How would you describe your time at National Securities Technol...?
Produced and modified communications, controls and mechanical drawings related to safety and communications systems. Monitored and documented a fire safety upgrade installation. Collected ATLAS project drawings and files including additional documentation for each file that was redlined, missing or required clarification. Gathered information, organized, added safety category and created reference ???number??? for the master equipment list which is the primary document for conducting maintenance at the Device Assembly Facility, a category 2 nuclear facility....
Engineer
tags:
cad
How would you describe your time at Canyon Electric Company?
Produced drawings, scope-of-work documents, and cost proposals for multiple electrical and communications projects at Nellis AFB.
Engineer
tags:
subcontractor supervision
How would you describe your time at G. C. Wallace/Additional Te...?
Insured subcontractor compliance to project design criteria for construction of a multimillion dollar planned community including infrastructure, commercial and residential development.
Outside Plant Engineer
tags:
document
• subcontract administrator
• change & configuration manage...
• field application
• permitting
• cad (autocad) ms office suites
How would you describe your time at Adesta Communications/MFS N...?
Support to MCI-WorldCom-Layout routing for new network routing designs for construction of new fiber optic connections to expand network in St Louis metropolitan area.
Support to Norlight-Identified repairs to an existing network, prepared work packages for craft, managed field change requests, created and implemented work acceptance/turn over plans. Incorporated project scope changes. Responsible for the creation of all turn-over documentation. Supervised co-op students, and maintained the project CADD network. Coordinated information gathering processes to create a Michigan state-wide fiber optic network. Supervised creation of all needed documentation for all State and Local permits. Managed sub-contractors. Maintained all design and permitting documentation in a high regulated environment....
Public Works Construction Inspector
tags:
liason
• report preparation
• punch list
• interact public safety systems
How would you describe your time at City of Milwaukie/Aerotek?
Acted as liaison between City Engineers, Utilities Engineers, Sub-contractors, and the public. Prepared daily inspection reports. Supervised the completion of turn-over punch list items.
Summer Intern / STEP Technical
tags:
piping alloys
• interact with a multitude of ...
How would you describe your time at Westinghouse Hanford Company?
Determined suitable piping solutions for an effluent processing facility. Analyzed chemical interactions to eliminate possible failure modes. Worked with multiple facilities engineers to facilitate the detailed design.
Summer Intern / STEP Technical
tags:
nuclear engineering
• drainage system
• waste tank
How would you describe your time at Westinghouse Hanford Company?
Designed single shell covers for multiple nuclear waste tanks. Designed site drainage system for storm water management.
Civil Engineering Technician
tags:
traffic analysis
• roadway engineer
How would you describe your time at USDA Forest Service?
Developed cost estimates for road maintenance which included road wear calculations, traffic pattern analysis, future usage projections, and field surveying for new public multi-usage trails and new roads.
Engineers' Aide
tags:
analisys
• road and bridge
• evaluate and supervise work
How would you describe your time at HNTB (Howard Needles, Tamme...?
Analyzed roadway conditions for the evaluation of project proposals for the State of Washington. Executed acceptance test and evaluation for work crews throughout the state.
Field Office Engineer
tags:
procurement
• charge backs administered
• project management
• subcontractors supervision
• regulation fd compliance
How would you describe your time at Friend & Rikalo?
Project management for a new irrigation pipeline project. Reviewed designs, analyzed regulation compliance, managed material procurement. Identified project scope changes, managed sub-contractor costs, and administered charge back procedures.
Education
Arts & Sciences
tags:
success driven
How would you describe your time at yakima valley community col...?
Returned to YVCC to take Humanities and Social Sciences courses necessary for graduation from Central Washington University
GPA-3.41
Mechanical Engineering Technology
tags:
leadership & team work / buil...
How would you describe your time at central washington university?
Sunnjsfiord scholarship 1991
Fluke Scholarship 1991
Student-Vice Chair (1990-91) Best Student Section in Region 1990-91 (ASME)
Charter President of CWU Student Chapter of Society of Women Engineers (SWE) 1990 Society of Women Engineers (SWE) Student-Charter President (1990) & President (1990-91), Regional Student Representative (1990-91 & 1991-92),
Best New Student Section in the Nation 1990-91 (SWE)
Best Student Section in the Region SWE (Washington, Oregon, Idaho, Montana & Alaska) 1990-91
Best Club on Campus at Central Washington University for October 1991 (SWE)...
Civil Engineering Technology
tags:
technical training
How would you describe your time at yakima valley community col...?
Degree Associates Degree in Applied Science. Beginning of engineering career. Engineering professors were practicing engineers. Math teacher was retired engineer.