Work history

Validation Engineer II

tags:

How would you describe your time at (GTKS) Bristol Myers Sq...?

EHS & TOU UPGRADES PROJECT
Report to the Sr. Validation Specialist with responsibilities of Qualification/Validation
Engineer II for the EHS & TOU Upgrade Project. Prepare and execute commissioning
documents packages for the Yard Header and Deaerator Systems which will serve the
new thermal
oxidizer units systems (TOUs).... read more
(GTKS) Pfizer Pharmaceuticals - Barceloneta, PR December 2006 to February 2007
Project Engineer II

tags:

How would you describe your time at (GTKS) Pfizer Pharmaceutica...?

PRODUCT TRANSFER AND ENABLING AT API FACILITIES PROJECT
Project/Field Engineer responsible for the mechanical modification/installation of
equipments as reactors, portable filters, filter skids, instrumentation, spray ball assemblies, process and utility pipes for new products transferences to
the site, a $1.541
MM upgrade. Review and foresee of possible limitations during design phase that can impact project progress. Coordinate the start-up, test, during C&Q activities, turnover of equipments and areas. Perform field supervision of subcontracted external or company personnel involve at the project.
... read more
PROJECT ENGINEER II

tags:

How would you describe your time at (GTKS) Pfizer Pharmaceutica...?

API AR-3 GLASS LINED REACTOR REPLACEMENT PROJECT
Project/Field Engineer responsible for the replacement of a 1,000 gallons glass lined reactor to a like for like reactor at API building. Trace the logistic for the construction
activities on the project. The primary responsibilities were RFPs,
coordination of daily construction activities, project meetings, daily reports, punch-listing, and daily
scheduling. Lead the coordination between vendors, fabricators, engineering consultants, contractors, and plant personnel as required, ensuring expedient execution of the project. Ensure that all construction meets the design specifications. Submit cost
control report and review the projects for safety, environment and mechanical soundness with the different committees set up to do this function. Coordinate start-up,
C&Q tests, reactor/areas turnover, and project close-out.
... read more
PROJECT ENGINEER II

tags:

How would you describe your time at (GTKS) Pfizer Pharmaceutica...?

API CR-1 REACTOR REPLACEMENT TO HAST ALLOY PROJECT
Project/Field Engineer responsible for the replacement of a 2,000 gallons glass lined reactor to a hastelloy alloy reactor at API building, an $800 M replacement. Trace the logistic for the construction activities on the project. The primary
responsibilities were coordination of daily construction activities, RFPs, project meetings, daily reports, punch-listing, and daily scheduling. Coordinate with vendors, fabricators, engineering consultants, contractors, and plant personnel as required ensuring expedient execution of a project. Ensure that all construction meets the design specifications. Submit
cost control report and review the projects for safety, environment and mechanical soundness with the different
committees set up to do this function. Coordinate the start???up, C&Q tests, reactor/areas turnover, and project close???out.
... read more
PROEJCT ENGINEER II

tags:

How would you describe your time at (GTKS) Pfizer Pharmaceutica...?

STRUCTURAL STEEL MODIFICATION/UPGRADE OF API B-104
Project/Field Engineer responsible for the construction management of the API Structural modification reinforcement of API building. Ensure that all construction meets the design specifications. Review the projects for safety, environment and
mechanical soundness with the different committees set up to do this function. Perform in the field supervision of outside or company personnel executing these projects.... read more
PROJECT ENGINEER I

How would you describe your time at (GTKS) Pfizer Pharmaceutica...?

WTTP LINER REPLACEMENT
Project/Field Engineer responsible for the civil, structural, mechanical and electrical trades for the WTTP Liner Replacement project, a $2.4 MM waste treatment plant upgrade. With responsibility for coordination of daily construction activities, RFPs, daily reports,
punch-listing, daily scheduling. Coordinate with vendors, fabricators,
engineering consultants, contractors, and plant personnel as required insuring expedient execution of a project. Ensure
that all construction meets the design specifications. Submit cost control report on a monthly basis and review the projects for safety, environment and mechanical soundness with the different committees set up to do this function. Perform in the field supervision of outside or company personnel executing these projects.
... read more
VALIDATION ENGINEER I

How would you describe your time at (ALPHATECH) Pfizer Pharmace...?

NEW QO BUILDING COMMISSIONING & QUALIFICATION
Report to the Validation Project Manager with responsibilities of a Qualification/Validation Engineer for the new QO Building Project. Prepared and executed various commissioning documents for facilities, heat transfer packages, and HVAC systems
that serves controlled Particulate Count Room, Air-Locks with HEPA filters, non-controlled laboratory general areas, and Chilled Water System at Utility facilities. Involved on the documentation of Pfizer forms as preventive maintenance activities forms, instrumentation and equipment CMMS forms, and Stock Room Material Authorization
forms, to obtain spare parts, preventive maintenance and Instrument calibration records related with validation activities.
... read more
Pfizer Pharmaceuticals - Arecibo, PR May 2003 to November 2003
MECHANICAL ENGINEER

How would you describe your time at Pfizer Pharmaceuticals - Ar...?

CHILLED WATER PLANT PROCESS OPTIMIZATION
Report to the Project Manager with responsibilities of a Mechanical Engineer to optimize the Utility Cooling Tower Pump System, through root-cause analysis of system failure, submittal of possible solutions, and selection of economically based solution
that should met their return of investment policy. Also, P&ID updating was performed using AutoCAD and 3D modeling of utility facilities, piping distribution and exploded view of the modeled Gould Pumps been analyzed was
performed using Solid Works for final presentation.
... read more

Education

Polytechnic University of PR May 1998 to November 2003
Mechanical Engineering

tags:

How would you describe your time at Polytechnic University of PR?

- Hard Work
- Great Theory-technical Knowledge
- Excellent Academic Experience

Similar People

Associate Process...
NEC Electronics
Chris Jantz-Sell
Product Manager
slide
Sistemarine
Umbilical design ...
Technip
Senior Technical ...
Health Care Servi...
john biewer
Master of Project...
keller
Jack Overton
Sr. Account Devel...
Honeywell
Romulus Balazs
Consultant
Taleo
Zorba Manolopoulos
Strategic Program...
Intel