Validation Engineer II
tags:
leadership & strong mechanica...
How would you describe your time at (GTKS) Bristol Myers Sq...?
EHS & TOU UPGRADES PROJECT Report to the Sr. Validation Specialist with responsibilities of Qualification/Validation Engineer II for the EHS & TOU Upgrade Project. Prepare and execute commissioning documents packages for the Yard Header and Deaerator Systems which will serve the new thermal oxidizer units systems (TOUs)....
Project Engineer II
tags:
strong leadership & multi-tas...
How would you describe your time at (GTKS) Pfizer Pharmaceutica...?
PRODUCT TRANSFER AND ENABLING AT API FACILITIES PROJECT Project/Field Engineer responsible for the mechanical modification/installation of equipments as reactors, portable filters, filter skids, instrumentation, spray ball assemblies, process and utility pipes for new products transferences to the site, a $1.541 MM upgrade. Review and foresee of possible limitations during design phase that can impact project progress. Coordinate the start-up, test, during C&Q activities, turnover of equipments and areas. Perform field supervision of subcontracted external or company personnel involve at the project....
PROJECT ENGINEER II
tags:
excellent achievement
• stong leadership & multi-task...
How would you describe your time at (GTKS) Pfizer Pharmaceutica...?
API AR-3 GLASS LINED REACTOR REPLACEMENT PROJECT Project/Field Engineer responsible for the replacement of a 1,000 gallons glass lined reactor to a like for like reactor at API building. Trace the logistic for the construction activities on the project. The primary responsibilities were RFPs, coordination of daily construction activities, project meetings, daily reports, punch-listing, and daily scheduling. Lead the coordination between vendors, fabricators, engineering consultants, contractors, and plant personnel as required, ensuring expedient execution of the project. Ensure that all construction meets the design specifications. Submit cost control report and review the projects for safety, environment and mechanical soundness with the different committees set up to do this function. Coordinate start-up, C&Q tests, reactor/areas turnover, and project close-out....
PROJECT ENGINEER II
tags:
excellent achievement
• stong leadership & multi-task...
How would you describe your time at (GTKS) Pfizer Pharmaceutica...?
API CR-1 REACTOR REPLACEMENT TO HAST ALLOY PROJECT Project/Field Engineer responsible for the replacement of a 2,000 gallons glass lined reactor to a hastelloy alloy reactor at API building, an $800 M replacement. Trace the logistic for the construction activities on the project. The primary responsibilities were coordination of daily construction activities, RFPs, project meetings, daily reports, punch-listing, and daily scheduling. Coordinate with vendors, fabricators, engineering consultants, contractors, and plant personnel as required ensuring expedient execution of a project. Ensure that all construction meets the design specifications. Submit cost control report and review the projects for safety, environment and mechanical soundness with the different committees set up to do this function. Coordinate the start???up, C&Q tests, reactor/areas turnover, and project close???out....
PROEJCT ENGINEER II
tags:
strong leadership & multi-tas...
How would you describe your time at (GTKS) Pfizer Pharmaceutica...?
STRUCTURAL STEEL MODIFICATION/UPGRADE OF API B-104 Project/Field Engineer responsible for the construction management of the API Structural modification reinforcement of API building. Ensure that all construction meets the design specifications. Review the projects for safety, environment and mechanical soundness with the different committees set up to do this function. Perform in the field supervision of outside or company personnel executing these projects....
PROJECT ENGINEER I
How would you describe your time at (GTKS) Pfizer Pharmaceutica...?
WTTP LINER REPLACEMENT Project/Field Engineer responsible for the civil, structural, mechanical and electrical trades for the WTTP Liner Replacement project, a $2.4 MM waste treatment plant upgrade. With responsibility for coordination of daily construction activities, RFPs, daily reports, punch-listing, daily scheduling. Coordinate with vendors, fabricators, engineering consultants, contractors, and plant personnel as required insuring expedient execution of a project. Ensure that all construction meets the design specifications. Submit cost control report on a monthly basis and review the projects for safety, environment and mechanical soundness with the different committees set up to do this function. Perform in the field supervision of outside or company personnel executing these projects....
VALIDATION ENGINEER I
How would you describe your time at (ALPHATECH) Pfizer Pharmace...?
NEW QO BUILDING COMMISSIONING & QUALIFICATION Report to the Validation Project Manager with responsibilities of a Qualification/Validation Engineer for the new QO Building Project. Prepared and executed various commissioning documents for facilities, heat transfer packages, and HVAC systems that serves controlled Particulate Count Room, Air-Locks with HEPA filters, non-controlled laboratory general areas, and Chilled Water System at Utility facilities. Involved on the documentation of Pfizer forms as preventive maintenance activities forms, instrumentation and equipment CMMS forms, and Stock Room Material Authorization forms, to obtain spare parts, preventive maintenance and Instrument calibration records related with validation activities....
MECHANICAL ENGINEER
How would you describe your time at Pfizer Pharmaceuticals - Ar...?
CHILLED WATER PLANT PROCESS OPTIMIZATION Report to the Project Manager with responsibilities of a Mechanical Engineer to optimize the Utility Cooling Tower Pump System, through root-cause analysis of system failure, submittal of possible solutions, and selection of economically based solution that should met their return of investment policy. Also, P&ID updating was performed using AutoCAD and 3D modeling of utility facilities, piping distribution and exploded view of the modeled Gould Pumps been analyzed was performed using Solid Works for final presentation....
Education
Mechanical Engineering
tags:
leader & motivator & team player
How would you describe your time at Polytechnic University of PR?
- Hard Work - Great Theory-technical Knowledge - Excellent Academic Experience
Similar People
Associate Process...
NEC Electronics
|
|
Umbilical design ...
Technip
|
Senior Technical ...
Health Care Servi...
|
Master of Project...
keller
|
Sr. Account Devel...
Honeywell
|
|
|
Strategic Program...
Intel
|
|
|
|